continue my training of overview OMS in new company
actually, nobody is my trainer these two days, i just found their documents and read myself, it was a little bit boring , enh? but i have passed the age need teacher , learning ability is also really required by employer, which is determined one's success or not in some degree, so learning by yourself becomes normal when you step your first step in a company.
it is interesting to find how a company run by reading QMS documents, maybe people in quality profession with this kind of occupational disease always have the same feeling like me.
our slogan is :"the heart of your process." that is for our product-pump, but in the running of company, i'd like to let ENG Dept. as the heart. as to now, i don'know how difficult will be for our salesman selling one piece of pump, if our pump is famous and indispensable just like we describe, our ENG Dept.,or say our capability of R&D will become the initial energy for running of the whole company.
every contract will transfer to FOP (factory order package) by HPI(sales Dept.), i suspect they have the ability to do this, but maybe that the truth, i don't know them very much after all.before that, contract review will be arranged by sales, production,ENG,QA,and purchasing , they discuss it together. FOP is our cole technical documents i think, it includes all requirements for a new order, orperating conditions, pump selection, applicable specification, site&utility data, design feature^^^^^^^ in a word, technical data sheet , all details for the product we will sell, what we do in sequence is producing a pump the FOP has eventually described.
FOP will be sent out to ENG for making BOM - bill of materials, which is a parts list for a pump. at the same time, purchasing request and test items are decided by ENG engineer, and then purchasing will buy what the pump need and QA ensure quality according to the criteria, you can see ENG dept. is the center of business running, of course they perticipate contract negociation and act the most important role.i always think that capability of R&D is the initial power of contiual improvement , am i rigtht?
for those nuclear pump,except BOM , quality plan will be used to ensure quality, which describes raw material and manufacturing test and inspection plans.
we have a whole quality system to do IQC,PQC and final inspection. those parts unchecked will not be allowed to store in warehouse. for process control, we have check station at assemblying, painting and packing, and also we have engineer to conduct final inspection. to control quality of mechenical process, we arrange fisrst check, sample check and review check 100%, that is a huge work i think.
lots of tests for checking are requrired , chemical analysis, mechenical properties such as tensile,impact,handness,corrosion test, heat treatment, 无损检查like liquid penetrant, magnetic particle , ultrasonic, radiographic,and hydrostatic pressure test, demension check, balancing, performance test, etc..i whish i could known what each test is and how do it , oh, that is my dream .
it is interesting to find how a company run by reading QMS documents, maybe people in quality profession with this kind of occupational disease always have the same feeling like me.
our slogan is :"the heart of your process." that is for our product-pump, but in the running of company, i'd like to let ENG Dept. as the heart. as to now, i don'know how difficult will be for our salesman selling one piece of pump, if our pump is famous and indispensable just like we describe, our ENG Dept.,or say our capability of R&D will become the initial energy for running of the whole company.
every contract will transfer to FOP (factory order package) by HPI(sales Dept.), i suspect they have the ability to do this, but maybe that the truth, i don't know them very much after all.before that, contract review will be arranged by sales, production,ENG,QA,and purchasing , they discuss it together. FOP is our cole technical documents i think, it includes all requirements for a new order, orperating conditions, pump selection, applicable specification, site&utility data, design feature^^^^^^^ in a word, technical data sheet , all details for the product we will sell, what we do in sequence is producing a pump the FOP has eventually described.
FOP will be sent out to ENG for making BOM - bill of materials, which is a parts list for a pump. at the same time, purchasing request and test items are decided by ENG engineer, and then purchasing will buy what the pump need and QA ensure quality according to the criteria, you can see ENG dept. is the center of business running, of course they perticipate contract negociation and act the most important role.i always think that capability of R&D is the initial power of contiual improvement , am i rigtht?
for those nuclear pump,except BOM , quality plan will be used to ensure quality, which describes raw material and manufacturing test and inspection plans.
we have a whole quality system to do IQC,PQC and final inspection. those parts unchecked will not be allowed to store in warehouse. for process control, we have check station at assemblying, painting and packing, and also we have engineer to conduct final inspection. to control quality of mechenical process, we arrange fisrst check, sample check and review check 100%, that is a huge work i think.
lots of tests for checking are requrired , chemical analysis, mechenical properties such as tensile,impact,handness,corrosion test, heat treatment, 无损检查like liquid penetrant, magnetic particle , ultrasonic, radiographic,and hydrostatic pressure test, demension check, balancing, performance test, etc..i whish i could known what each test is and how do it , oh, that is my dream .
TA的首页

