Does supplier set up data gathering procedure for reliability program and well clarify the database structure?
Does the data gathering structure is set as defective component for each failure, age of failure (in order to do MTBF study), and defect symptom
Does supplier make the complete statistic FA plan and clarify the data analysis structure?
Does supplier conduct data analysis for overall failure trend overtime by part number, failure trend over time by each defective symptom and failure trend overtime
Does supplier clear define the structure of lessons learned database and feedback loop?
Does supplier assign the owner of each failure category (Design/Material/Process)?
Has supplier set up lessons learned database to do on-time monitoring?
Does supplier
Does supplier deploy design FMEA?
Does supplier utilize lessons learned database and FMEA for further improvement of product capability and better technology?
Does supplier set up phase review process as a gate for design phase?
Does supplier make the pl
Has supplier made the plan to enhance the qualification test procedure, including periodical qualification criteria review procedure, in order to get better margin on new product?
Does supplier conduct design margin test, such as Mechanical, Electrical an
Does supplier deploy Process FMEA?
Does supplier conduct SPC&DOE to define optimized specification for process qualification specification & for effectively process control?