全部 论坛 文章 培训 人才 圈子 签到 VIP 话题 收藏 7Tool SQE 体系 管理 5手册 Rohs 认证 六西格玛 精益 精华 ai问答 评估我
资料库上万份资料 AIAI问答智能答疑 评估我能力评估
请高手帮忙翻译下,急
头像
本帖最后由 jxgzljp 于 2011-2-25 10:22 编辑

请教高手,帮忙翻译下,在线等候。
1. Need to use "brittle" silicon on the connections inside shoe, not the gummy version that won't come off.
2. "Hand tighten" all external screws – so they don’t strip if repair needed.
3. Install v.1.25 with FLIP.
4. Cycle power on each shoe on/off 20 times to prove firmware will not fail.
5. Run test program to test all buttons and lights on each shoe are functioning.
6. Check backlight on LCD is illuminated.
7. Need to UV strip test and confirm nose reads at 50 Angstrom or below (NEED USPC TO PROVIDE SAMPLES TO TEST WITH).
8. Sensor A: Grey Strip test needs to be in on/off correct area (NEED GRAYSCALE CARD TO TEST WITH).
9. Card guide gap must be in spec to keep cards over reader properly; check card gap height is 0.022” to 0.019”, card width is 3.479” to 3.489”.
10. Card Guide: Need to make sure every screw installing card guide is tighten; had some missing screws in the past
11. Need to pull sample cards of USPC and Fournier UV codes (NEED USPC TO PROVIDE SAMPLES TO TEST WITH).
12. Check each shoe with its respective power cord and power supply to ensure no shorts.
13. Output voltage on each external power supply must be 5.0V minimum, 5.15V maximum.
14. Check the DB9 port is installed correctly with custom standoffs; should test by installing a comm cable.
15. LID sensor quality: Need to make sure LID alarm won't happen after LID cover had installed.
16. Rolling Mouse 1: Need to check the mouse with brake.
17. Rolling Mouse 2: Need to be drop down smoothly.
18. Faceplate: Need to check magnets installed and secure with no break in plastic boss
19. LID cover: Need to check magnets installed and secure with no break in plastic boss
20. Strain relief: Need to check the size of the strain relief or the hole of back cover is correct so customer can install successfully.
21. Need list of all shoe serial numbers manufactured and statement they passed all these checks (COA).

5 回答 3191 浏览 2011-02-25
(ISO 9001/ISO 14001/ISO 45001)内审员4天 5000元查看 ›
共 5 个回答 按票数 最新
头像
回复 forum.php?mod=redirect&goto=findpost&pid=3507271&ptid=265655

各位太忙了,也没有人帮忙下,英文太差了,
2011-02-25 10:44
本问题共 5 个回答,登录后查看全部
登录查看
IMS (ISO 9001/ISO 14001/ISO 45001)内审员4天 5000元查看 › IATF16969内审员4天 5000元查看 ›
相关问题
高手请帮忙翻译个句子
3 回答 · 2962 浏览
请问有高手可以帮忙翻译一下 专有名词 电渡液
7 回答 · 3483 浏览
请高手帮忙翻译一下这些英文(急)
3 回答 · 3165 浏览
哪位高手帮忙翻译一下?
8 回答 · 2832 浏览
高手来看看:再帮忙翻译一句
17 回答 · 3706 浏览
请高手帮忙翻译
5 回答 · 2415 浏览
请英语高手帮忙翻译下,谢谢!
4 回答 · 2381 浏览
请英语高手帮忙翻译下,谢了!
7 回答 · 2685 浏览
[求助]哪位大侠帮忙翻译一下MTB14的菜单
8 回答 · 6929 浏览
帮忙翻译啊!!!
5 回答 · 5589 浏览
首页 发现 +发布 消息 我的
6S
把 6SQ 添加到桌面
像 App 一样快速访问,体验更流畅