全部 论坛 文章 培训 人才 圈子 签到 VIP 话题 收藏 7Tool SQE 体系 管理 5手册 Rohs 认证 六西格玛 精益 精华 ai问答 评估我
资料库上万份资料 AIAI问答智能答疑 评估我能力评估
OEE计算 英文版
头像
最基本的,希望对大家有用 和老外解释就不用那么麻烦了。。。
Calculating OEE
The Formulas
As described in World Class OEE, the OEE calculation is based on the three OEE Factors: Availability, Performance, and Quality. Here's how each of these factors is calculated.
Availability
Availability takes into account Down Time Loss, and is calculated as:
Availability = Operating Time / Planned Production Time
Performance
Performance takes into account Speed Loss, and is calculated as:
Performance = Ideal Cycle Time / (Operating Time / Total Pieces)
Ideal Cycle Time is the minimum cycle time that your process can be expected to achieve in optimal circumstances. It is sometimes called Design Cycle Time, Theoretical Cycle Time or Nameplate Capacity.

Since Run Rate is the reciprocal of Cycle Time, Performance can also be calculated as:
Performance = (Total Pieces / Operating Time) / Ideal Run Rate
Performance is capped at 100%, to ensure that if an error is made in specifying the Ideal Cycle Time or Ideal Run Rate the effect on OEE will be limited.
Quality
Quality takes into account Quality Loss, and is calculated as:
Quality = Good Pieces / Total Pieces
OEE
OEE takes into account all three OEE Factors, and is calculated as:
OEE = Availability x Performance x Quality
It is very important to recognize that improving OEE is not the only objective. Take a look at the following data for two production shifts.

OEE Factor Shift 1 Shift 2
Availability 90.0% 95.0%
Performance 95.0% 95.0%
Quality 99.5% 96.0%
OEE 85.1% 86.6%

Superficially, it may appear that the second shift is performing better than the first, since its OEE is higher. Very few companies, however, would want to trade a 5.0% increase in Availability for a 3.5% decline in Quality!

The beauty of OEE is not that it gives you one magic number; it's that it gives you three numbers, which are all useful individually as your situation changes from day to day. And it helps you visualize performance in simple terms - a very practical simplification.
Example OEE Calculation
The table below contains hypothetical shift data, to be used for a complete OEE calculation, starting with the calculation of the OEE Factors of Availability, Performance, and Quality. Note that the same units of measurement (in this case minutes and pieces) are consistently used throughout the calculations.

Item Data
Shift Length 8 hours = 480 min.
Short Breaks 2 @ 15 min. = 30 min.
Meal Break 1 @ 30 min. = 30 min.
Down Time 47 minutes
Ideal Run Rate 60 pieces per minute
Total Pieces 19,271 pieces
Reject Pieces 423 pieces

Planned Production Time
=
=
= 420 minutes

Operating Time
=
=
= 373 minutes

Good Pieces
=
=
= 18,848 pieces

Availability = Operating Time / Planned Production Time
= 373 minutes / 420 minutes
= 0.8881 (88.81%)

Performance = (Total Pieces / Operating Time) / Ideal Run Rate
= (19,271 pieces / 373 minutes) / 60 pieces per minute
= 0.8611 (86.11%)

Quality = Good Pieces / Total Pieces
= 18,848 / 19,271 pieces
= 0.9780 (97.80%)

OEE = Availability x Performance x Quality
= 0.8881 x 0.8611 x 0.9780
= 0.7479 (74.79%)

8 回答 11073 浏览 2008-11-17
(ISO 9001/ISO 14001/ISO 45001)内审员4天 5000元查看 ›
共 8 个回答 按票数 最新
头像
好资料, 感谢! 方便了兄弟门呀 !!! 以后跟老外讲解这个真的是没有那么麻烦了
2008-11-17 12:39
本问题共 8 个回答,登录后查看全部
登录查看
IMS (ISO 9001/ISO 14001/ISO 45001)内审员4天 5000元查看 › IATF16969内审员4天 5000元查看 ›
相关问题
请教OEE指标的计算
7 回答 · 12779 浏览
大家好!很好的英文版OEE
4 回答 · 4103 浏览
企业OEE计算问题的解决
7 回答 · 4119 浏览
OEE是针对每台设备计算的吗
6 回答 · 6758 浏览
OEE如何计算
2 回答 · 3064 浏览
福特OEE资料,很详细的解释了OEE如何计算。
41 回答 · 8550 浏览
OEE计算中的问题
1 回答 · 3041 浏览
OEE的计算
4 回答 · 4966 浏览
OEE实际计算时遇到的问题
13 回答 · 5020 浏览
OEE 计算
11 回答 · 6405 浏览
首页 发现 +发布 消息 我的
6S
把 6SQ 添加到桌面
像 App 一样快速访问,体验更流畅