The 8 Disciplines (8D) Process



•The 8 Disciplines (8D) process is a problem management tool popularly used in responding to customer returns or issues. Its effectiveness stems from the fact that it incorporates all the important aspects of problem management, i.e.:
–containment of the problem
–root cause analysis
–problem correction, and
–problem prevention, etc.
•The output of an 8D process is the 8D report, the format of which follows the steps of the 8D process



•Problem Solving disciplines:
–D1: Form. the team
–D2: Describe the Problem
–D3: Develop Interim Containment Actions
–D4: Define the Root Cause
–D5: Choose Permanent Corrective Actions
–D6: Implement Permanent Corrective Actions
–D7: Preventive Actions
–D8: Recognize the Team
•8D is clearly a systematic and successful method of problem solving

This is the first step of the 8D process and the first part of the 8D report. This step defines the composition of the 8D team. The team should be cross-functional and should include as members the process owner, a member from QA, and others who will be involved in the containment, analysis, correction and prevention of the problem. The names of the members as well as their positions in the company organization must be enumerated in this part of the report.


•This step involves a detailed assessment of the problem highlighted by the customer. Under this step, the 8D report provides background information on and a clear picture of the problem being highlighted by the customer. It should include the following details:
a)the identity of the customer
b)a description of the customer application
c)device information (device, package, lot #, date code, etc.)
d)when the problem was encountered
e)where the problem was encountered
f)a specific description of the failure mode; and
g)failure rate.


•This discipline explains the extent of the problem and bounds it. Based on initial problem investigation, all lots that are potentially affected by the same problem must be identified and their locations pinpointed. If possible, specific lot #'s and/or date codes of potentially affected lots shall be enumerated in this portion of the report
•Lots that are still in the factory must be put on hold until their reliability has been properly assessed. They must only be released if the lots are either proven to be clean or the failures may be effectively screened
•If the problem has an extremely high reliability risk and the application of the product is critical (e.g., failure of the product is life-threatening), lots already in the field may need to be recalled. However, recall must only be done under extreme cases wherein the impact of reliability risk is greater than the impact of recall


•This 8D process step consists of performing the failure analysis and investigation needed to determine the root cause of the problem. The corresponding portion in the 8D report documents the details of the root cause analysis conducted. A detailed description of the actual failure mechanism must be given, to show that the failure has been fully understood
•The root cause is then presented, showing how it triggered the failure mechanism identified. All events emanating from the root cause and leading to the failure mechanism must be included in the explanation. As much evidence as possible must be provided to show that the root cause is the real culprit behind the problem
•The root cause must also be correctively actionable

The sixth discipline of the 8D process involves the actual implementation of the identified corrective actions, details of which must be documented in the corresponding portion of the 8D report. The dates of completion and owners of the corrective actions must be shown in this section. Data showing that the corrective actions are effective in preventing the root cause of the problem must be presented. Any deficiency in the effectiveness of the corrective actions must be addressed by improvements in or additions of corrective actions


•This next discipline should not be confused with 'correcting' the problem. Prevention of the problem entails the identification of devices or packages that are similarly vulnerable to the same problem highlighted by the customer, even if not affected under the current situation. Actions necessary to prevent these from being affected by a similar problem in the future are called preventive actions
•All preventive actions must be enumerated, along with their owners and target dates of completion
•An important aspect of this discipline is the standardization and deployment of corrective actions or process improvements to all products that may possibly be subjected to the same issue

The last step of the 8D process and the last portion of the 8D report consists of an acknowledgement from management of the good work done by 8D team. Approvals for the 8D report are also shown in this last discipline.