1、Quality objectives for JIT have not been established yet.
及时交付作为质量目标还没有建立.
2、Process audit for steering ball bolts does not conducted based on manu-facturing process.
转向球销的过程审核没有按制造过程开展
3、The PFMEA was established for proc-ess design for the new product S1072061-AOH, but relevant process parameter e.g heating time was failed to be effectively evaluated and quanti-fied as input for control plan.
PFMEA 在新项目的应用未能对相关过程参数进行有效地量化.如加热时间.
4、In the extrusion shop, process #3, there was lack of quality record to evidence that heating temperature was effectively under monitoring as proc-ess parameter defined in the relevant control plan.
挤压车间第三过程中加热温度的监控缺乏客观记录.
5、FTC, as the process performance objective, is 94.86% (poor then the objective set 99.8%), the root cause analysis and subsequent corrective action are not available.
一次交付作为生产过程业绩在六月份是94.86%,底于目标, 相应的原因分析和纠正措施没有形成.
6、It is not evident that the records for “D” characteristics of steering ball bolt have been suitable maintained accord-ing to 20 years requirements.
没有证据显示D 特性转向球头的纪录能保持20年.
6、It is not evident that the records for “D” characteristics of steering ball bolt have been suitable maintained accord-ing to 20 years requirements.
没有证据显示D 特性转向球头的纪录能保持20年.