LCD MONITOR: PRODUCTION-LINE POLARIZATION VERIFICATION TEST

以下是UL FUS 部分描述:
REPORT On LISTED – LCD MONITOR (UL 60065, AZSQ/AZSQ7)
APPENDIX A
.......
PRODUCTION-LINE POLARIZATION VERIFICATION TEST
A.General - Except as may be noted in the individual descriptive sections under PRODUCTION LINE TESTS, the manufacturer shall subject 100 percent of production of all products that have a polarized attachment plug, to a routine electrical continuity Production-Line Polarization Verification Test in accordance with the following.
B.Test Equipment - If visual inspection is not permissible (as indicated in the individual descriptive sections under PRODUCTION-LINE TESTS, Polarization Verification), any suitable continuity indicating device (such as an ohmmeter, a battery and buzzer combination, or the like) may be used to verify compliance with the Polarization Verification Test requirements.
C.Method - Electrical Continuity shall be verified between the indicated supply-circuit conductor of the attachment plug (wide blade of a two-wire plug) and the part of the product specified in the individual descriptive sections under PRODUCTION LINE TESTS, Polarization Verification.
D.Basis for Acceptability - Electrical continuity shall be verified between the indicated supply-circuit conductor of the attachment plug and the part specified.
......
XXX型号的LCD MONITOR UL TESTING REPORT(部分)
.....
Polarization –
Ungrounded supply circuit conductor must be connected to: Fuse F7000.
....
请问,在生产过程中一般是如何实现UL PRODUCTION-LINE POLARIZATION VERIFICATION TEST要求的?
万分感谢!!!
对“好”的回答一定要点个"赞",回答者需要你的鼓励!
已邀请:

lvyinqing (威望:1) (江苏 南京) 电子制造 主管

赞同来自:

朋友,翻译成中文或许关注的人会更多!

1 个回复,游客无法查看回复,更多功能请登录注册