🔒 Please log in to use tool features (fill sample / analyze / AI interpretation / export document)
🎯 RBI Risk Matrix (5×5)
Likelihood × Consequence → risk level and equipment inspection strategy recommendation
🔧 All Tools
Input Mode
Notes
· Risk score = Likelihood × Consequence; ≤4 Low, 5–9 Medium, 10–14 High, ≥15 Very High.
· Used for initial equipment-inspection-tier screening (API 581 concept); official RBI program governs final decisions.
AI Report
Generate a beautiful HTML chart report. Download as Word or print to PDF.
AI Report Preview

About RBI Risk Matrix

Risk-based inspection (RBI) tool: assess likelihood and consequence per API 580/581, locate equipment on a 5x5 risk matrix and get inspection strategy advice.

Learn more about this tool → ← Back to all quality tools